虹吸式泄水建筑物水工模型试验  

Hydraulic Model Test for Siphon Releasing Structure

在线阅读下载全文

作  者:安静华[1] 

机构地区:[1]水利部山西水利水电勘测设计研究院

出  处:《山西水利科技》2003年第1期44-46,共3页Shanxi Hydrotechnics

摘  要:虹吸式泄水建筑物,目前国内尚未见到成功的报道。在万家寨引黄联接段工程弃水设计方案中曾做了模型试验,本文对模型试验的过程及结果进行阐述和分析。The hydraulic model test for siphon releasing structure was done according to the design schem of releasing waste water in “connection works”,Wanjiazhai YRDP (Yellow River Diversion Project).The test process and the test result are described in this paper.The siphon releasing structure is located in the pressure forebay of Huyan water treatment plant ,which is about 0.7km downstream of the outlet of tunnel NO.7 of “connection works”,Wanjiazhai YRDP,and is designed for the purpose of releasing the waste water when the inlet valve is promptly closed in case of emergeney in Huyan water treatment plant.

关 键 词:虹吸式泄水建筑物 水工模型试验 引黄工程 虹吸溢洪道 

分 类 号:TV135.2[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象