复式节制闸在联接段7#隧洞弃水控制中的应用  

Application of Multiple Control Gate in Controlling Waste Water of Tunnel NO.1 of “Connection Works”,the South Main Line,Wanjiazhai YRDP (Yellow River Diversion Project)

在线阅读下载全文

作  者:贺红效[1] 

机构地区:[1]水利部山西水利水电勘测设计研究院

出  处:《山西水利科技》2003年第1期91-92,共2页Shanxi Hydrotechnics

摘  要:万家寨引黄工程联接段上段43.5km为有压管道输水,而长13.5km的7#隧洞为明流输水,当7#隧洞下游呼延水处理厂发生紧急事故时,有很大一部分弃水会排泄,为了减少弃水损失,本文介绍了7#隧洞出口的复式节制闸的调蓄弃水量的设计方案。A multiple Control gate,which is located in outlet of tunnel NO.1 of “connection works”,the south main line,Wanjiazhai YRDP,and is used as a facility to store the water that would originally be released as waste water in the tunnel NO.7,when emergency had happened in Huyan water treatment plant downstream of the tunnel NO.7 is introduced conerning its design in this paper.Preliminary operation done on October 8,2002 shows that the mutiple control gate has better effect to reduce the waste water.

关 键 词:复式节制闸 隧洞 弃水 引黄工程 管理输水 调蓄 

分 类 号:TV66[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象