检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贺红效[1]
机构地区:[1]水利部山西水利水电勘测设计研究院
出 处:《山西水利科技》2003年第1期91-92,共2页Shanxi Hydrotechnics
摘 要:万家寨引黄工程联接段上段43.5km为有压管道输水,而长13.5km的7#隧洞为明流输水,当7#隧洞下游呼延水处理厂发生紧急事故时,有很大一部分弃水会排泄,为了减少弃水损失,本文介绍了7#隧洞出口的复式节制闸的调蓄弃水量的设计方案。A multiple Control gate,which is located in outlet of tunnel NO.1 of “connection works”,the south main line,Wanjiazhai YRDP,and is used as a facility to store the water that would originally be released as waste water in the tunnel NO.7,when emergency had happened in Huyan water treatment plant downstream of the tunnel NO.7 is introduced conerning its design in this paper.Preliminary operation done on October 8,2002 shows that the mutiple control gate has better effect to reduce the waste water.
关 键 词:复式节制闸 隧洞 弃水 引黄工程 管理输水 调蓄
分 类 号:TV66[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28