大功率汽轮机参与调峰末级面临的新问题  

New Problems of the Last Stage in a Large Output Steam Turbine Used for Load Adjustment

在线阅读下载全文

作  者:庞立云[1] 

机构地区:[1]华北电力学院

出  处:《河北电力技术》1992年第1期44-47,共4页Hebei Electric Power

摘  要:大功率汽轮机参与电网调峰在小容积流量下运行时,末级面临效率下降、动叶出汽边水蚀、叶片颤振等新问题。末级这些新问题给机组运行的经济性和安全性带来严重的影响,应在气动、工艺和结构设计上采取有力措施,必要时应限制机组的低负荷运行界线。When a large output steam turbine is used for load adjustment in a power grid, its last stage at light volume flow faces some new problems, including the decrease in stage efficiency, the erosion of the bucket exit edge and the fluttering of the bucket. These new problems of the last stage bring about serious effects on the economy and security of turbine operation. We should take measures to improve the design aerodanamically, procedurally and structrally. If necessary, we should set a minimum operating load for the turbine.

关 键 词:汽轮机 大功率 调峰 

分 类 号:TK267[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象