检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张燎军[1] 翟利军[1] 贾德斌[2] 杨昌定[2]
机构地区:[1]河海大学水利水电工程学院,南京210098 [2]安徽水利水电勘测设计院,合肥230022
出 处:《大坝与安全》2003年第2期32-35,共4页Dam & Safety
摘 要:丰乐双曲拱坝运行多年后出现了严重裂缝,本文对该坝加固方案坝体的变形和应力进行了三维全过程有限元仿真分析。分时段模拟了地基应力、坝体自重应力、水沙荷载的分级加载,考虑了裂缝的影响、加固钢纤维混凝土及保温材料效果。计算方案能真实模拟加固方案中坝体的实际应力状态。通过加固前后坝体应力对比分析,论证了加固方案的可行性和合理性,并提出了加固方案施工时的一些建议。After working more than20years,Fengle double arch dam appeared much serious breaking joint.In this paper,the de-formation and stress of the reinforcing scheme of this dam are emulated completely by using3-D nonlinear FEM.The foundation stress,deadweight,water and soil load are simulated.The influence of cracks and effect of reinforcing SFRC and thermal insulation material are considered.The calculation method can simulate real stress status in reinforcing scheme.By comparing dam stress be-fore and after reinforcement,its feasibility and rationality is demonstrated.Moreover,some beneficial proposals in construction of re-inforcing scheme are put forward.
关 键 词:丰乐双曲拱坝 加固 三维有限元 仿真分析 裂缝 钢纤维混凝土 保温材料
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28