检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋恩来[1]
出 处:《东北电力技术》2003年第4期5-9,共5页Northeast Electric Power Technology
摘 要:介绍了水丰水电站初期运行情况及出现的主要问题 ,电站经恢复改建后为中朝两国做出很大的贡献 ,不仅提供了动力和能源 。This article mainly deals with the initial operation conditions and main problems appeared during that time in Shuifeng Hydroelectric Power Plant,which have made great contributions to both China and PDRK after being remodeled.It has not only provided power and energy but also avoided or reduced flood that may otherwise break out in the down stream.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.246.156