检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东矿业学院
出 处:《煤炭科学技术》1985年第4期23-27,60,共6页Coal Science and Technology
摘 要:随着矿井产量的大幅度增长及矿井技术改造的进行,矿井延深设计已成为各局矿常遇的问题。怎样提高矿井水平延深设计的质量,得到技术合理、经济合算的延深方案,就成为当前急需解决的课题。现探讨如下:comparison method is mainly used for selection of plan in design of mine deepening at present time,but the total cost is mostly taken into considerations for economic comparision of plans,this might be unreasonable.The proper method is that choosing the optimal system from compound systems which are obtained by puting various subsystems together in different ways of combinations,and economic comparisions are made by current value method.Generally speaking,the minimum cast of sum of capital investments and tuning cost are considered as object function,i.In this paper the selection and simulations of a mine deepening plan are give for economic comparison using computer technique,the minimum and maximum values of plan cost are obtained.Therefore,the cost of adopted plan is beinq between the minimum and maximum values.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185