检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:褚召祥[1,2] 闫洪远[1,2] 唐瑜 颜雪文 陈连省
机构地区:[1]瓦斯灾害监控与应急技术国家重点实验室,重庆400039 [2]中国煤炭科工集团重庆研究院有限公司,重庆400039 [3]重庆永荣矿业有限公司永川煤矿,重庆402460 [4]江西省能源集团公司丰城矿务局尚庄煤矿,江西丰城331100 [5]山东省唐口煤业有限公司,山东济宁272055
出 处:《煤炭科学技术》2015年第5期95-99,共5页Coal Science and Technology
基 金:"十二五"国家科技支撑计划资助项目(2012BAK04B02);重庆市科技人才培养计划资助项目(cstc2013kjrc-qnrc90001);中国煤炭科工集团创新基金重点资助项目(2011ZD001)
摘 要:为有效治理煤矿井下存在的高温热害现象,开发了制冷量为400 k W的ZL400/660半封闭式螺杆制冷机组,介绍了其工作原理、结构特点及主要技术指标,并利用自建的检测平台对其运行工况参数进行测试。结果表明:该制冷机组运行稳定,设计条件下机组实际制冷量为420 k W,制冷性能系数达到3.4。同时以ZL400/660制冷机组为核心,建设了局部冷水、冷风降温系统,利用矿井涌水和回风综合排热,使掘进工作面100 m范围内干球温度平均降低5.6℃,湿球温度平均降低8.5℃,相对湿度平均降低20%,该降温系统可以用于治理矿井深水平开拓期间掘进工作面产生的高温热害,为我国矿井高温热害治理提供技术与装备支持。In order to effectively control a high temperature heat disaster phenomenon existed in an underground mine ZL400 /660 mode semi-closed screw refrigeration unit with refrigerating capacity of 400 k W was developed. The paper introduced the working principle,structure features and main technical index and a surface ground test was conducted on the operation performance parameters with self made inspection platform. The results showed that the operation of the refrigeration unit was stable. Under the designed condition,an actual refrigerating capacity of the refrigeration unit was 420 k W and the refrigeration performance coefficient reached at 3. 4. Based on the ZL400 /660 mode refrigeration unit as a core,a local cold water and cold wind cooling system was established. The mine water inflow and air retuning applied to the comprehensive thermal drainage could make a dry-bulb temperature within a scope of 100 m near the heading face reduced by 5. 6 ℃ in average,a wet bulb temperature reduced by 8. 5 ℃ in average and a relative humidity reduced by 20% in average. The high temperature heat disaster occurred from the heading face during the heading period could be controlled in the high level of the mine and the technical and equipment support could be provided to control the high temperature disaster in China mines.
分 类 号:TD727.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.174.159