机构地区:[1]开滦(集团)有限责任公司,河北唐山063018 [2]河北联合大学矿业工程学院,河北唐山063009 [3]河北省矿业开发与安全技术重点试验室,河北唐山063009
出 处:《煤炭科学技术》2015年第5期126-129,共4页Coal Science and Technology
基 金:国家自然科学基金资助项目(51174071/E0409);"十二五"国家科技支撑计划资助项目(2012BAK04B04);中国煤炭工业协会科学技术研究指导计划资助项目(MTKJ2013-419);河北省科技支撑指导资助项目(13275412)
摘 要:为解决隐伏向斜构造复杂区回采工作面强涌水与井下泥石流问题,以东欢坨矿2286工作面为例,采用高密度电法探测技术结合地质构造控水理论分析,得到了该工作面含水层径流与富集规律,并提出了工作面超前疏放水方案。结果表明:对井下煤水混合致灾问题,可采用强排水、煤水流量控制与煤水分离联合技术,在强径流富水区宜采用密集多孔疏放水技术,实现静储量快疏、动储量少疏;为预防煤水泥灾害,应建设完善井下强排水与分流系统,对工作面出水点、工作面积水区在巷道内及早实现清水收集与分流,因地制宜地采用多级振动筛、沉淀池并配合刮板输送机对煤水混合物进行井下分离与自动转运,采用这些合理措施,消除了在强涌水情况下2286工作面被淹没的危险。In order to solve a high water inflow in the coal mining face and mud-rock flow problems of the complicated hidden syncline structure,based on No. 2286 coal mining face of Donghuantuo Mine as a case,with application of detection technology with high density resistivity method,in combination with geological structure water control theory analysis,runoff and enrichment law of the aquifer in the coal mining face was obtained and an advance water discharging plan of the coal mining face was provided. The results showed that disaster caused by the coal and water mixed could be solved with high water discharging,coal and water flow control and coal and water separation three step combined technology. In the high runoff watery zone,a dense multi boreholes water discharging would be suitable applied to realize quick discharging of static water reserve and less discharging of dynamic water reserve. To prevent coal water mixture,high water discharging and water separation system should be well established in the underground mine. A clean water collection and separation should be set up and realized as early as possible in the mining gateway for the water inflow point and ponding area in the coal mining area. According to the local conditions,multi stage vibration screen and sedimentation tank with scraper conveyor could be applied to separate and auto transfer the coal and water mixture. With scientific design,rational measures applied could eliminate water flood danger of the coal mining face under the high water inflow condition.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249