检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学电气工程学院,江苏省南京市210098
出 处:《电力系统自动化》2003年第10期31-34,共4页Automation of Electric Power Systems
摘 要:以电价为研究对象 ,针对带有独立电厂和抽水蓄能电厂等独立电源的电力公司 ,在综合分时电价形式和边际成本定价方法的基础上 ,提出了其相应的分时电价模型。模型以电力公司日运营收益最大为目标 ,考虑了用户对电价波动的响应以及独立电厂、抽水蓄能电厂的发电成本曲线和机组参数等约束条件。A timed electricity pricing model for power corporation with independent power source such as independent power plant and pumped storage is proposed as the result of study on electricity price, which is based on timed electricity pricing form and marginal cost. In the model trading price and trading quantities of all operations are considered as model parameters, as well as operating income as model objects. At the same time, the response of user aroused by electricity price fluctuation, generation cost curve and unit parameters of independent power plant and pumped storage are considered as restriction. The simulation result indicates the model is reasonable and the algorithm is effective.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3