检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱岳明[1] 陈建余[1] 龚道勇[1] 陈玉夫[2] 杨成祝[2]
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]水利部东北院,吉林长春130021
出 处:《岩土工程学报》2003年第3期326-330,共5页Chinese Journal of Geotechnical Engineering
基 金:教育部高校骨干教师资助计划资助项目
摘 要:笔者在近 2 0年来对工程渗流问题研究的基础上 ,针对拱坝坝基岩体的渗流特性和有复杂的防渗与排水降压渗控措施 ,详细地论述了如何用有限单元法精细地求解坝基整体渗流场的思想和具体处理技术 ,所提出的算法技术在理论上是严密的 ,多年来一直已在工程中得到了广泛的成功应用。最后 ,作为算例对一个高 14Based on their own research work lasting over 20 years and taking into account the seepage characteristics of the fractured rock masses and the complicated seepage prevention and drainage measures in arch dam foundations, the authors presented the main concepts and concrete techniques for strictly refined solution to 3D seepage problems in arch dam foundations with finite element method in detail. For the propose, many concepts and techniques are introduced, such as the procedure of nodal virtual flux, drainage substructure of drainage holes, transformation of type of seepage boundaries, exit flowing drainage hole, overflowing drainage hole, switch of seepage, real seepage domain, virtual seepage domain, real element, virtual element, transition element, continuous model, discontinuous model, and hybrid model. These are theoretically strict and have been widely and successfully used in practice for many years. Finally, as an example, a 3D seepage field in the foundation of a 140 m high arch dam is calculated and analyzed.
分 类 号:TV223.6[水利工程—水工结构工程] TV642.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15