检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵伏军[1] 李夕兵[2] 赵国彦[2] 李启月[2] 胡柳青[2] 刘国富
机构地区:[1]湖南科技大学,湖南湘潭市411201 [2]中南大学,湖南长沙410083 [3]山东省新城金矿,山东莱州市261000
出 处:《矿业研究与开发》2003年第3期12-14,19,共4页Mining Research and Development
摘 要:针对新城金矿极破碎顶底柱难以安全采出的情况,开展了采场地压规律的动态监测。应用YZY型钻孔应力传感器和二次接收仪测量采场地压变化,采用电子数显式收敛计量测围岩变形,得出了顶底柱开采地压变化的一般规律,为选择合理的矿柱开采方案和地压控制措施提供了科学的依据。According to the conditions that the very broken crown and sill pillars in Xincheng gold mine are difficult to be mined safely, the dynamic monitoring of the law of stope ground-pressure was carried out. The change of stope ground-pressure was measured by use of Model YZY borehole stress sensor and the secondary receiver, and the electronic digitally-displayed convergence indicator was used to measure a deformation of surrounding rock, so as to obtain a general law of ground pressure in the mining of crown and sill pillars. This provides a scientific basis for selecting the rational pillars mining scheme and the ground-pressure control measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145