10MW高温气冷堆的应急计划与应急准备  被引量:2

Emergency Planning and Preparedness for HTR-10

在线阅读下载全文

作  者:吴中旺[1] 曲静原[1] 刘原中[1] 奚树人[1] 

机构地区:[1]清华大学核能技术设计研究院,北京100084

出  处:《核动力工程》2003年第3期277-280,共4页Nuclear Power Engineering

摘  要:为了保护环境、公众和工作人员,按照核设施纵深防御的原则,10MW高温气冷堆(HTR-10)必须制定应急计划,并在此基础上作好应急准备,以便在事故情况下可以采取快速有效的应急响应行动,减轻事故的后果。本文依照研究堆的核安全法规和导则,并根据HTR-10的安全特性,完成了HTR-10应急计划的制定、应急准备及装料前的场内综合应急演习等工作,保证了HTR-10在2000年建成并达到临界。In order to protect the environment, public and staffs, and in accordance with the principle of defense in depth, the emergency planning shall be established for HTR-10 to get ready for any emergency and take emergency response actions under accidents. Based on the codes on the safety of research reactors and the safety features of HTR-10, the emergency plan has been developed and exercises on the preparedness and emergency response has been conducted before the first loading of fuel on HTR-10.

关 键 词:10MW高温气冷堆 应急计划 应急准备 

分 类 号:TL69[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象