土石过水围堰过水期最不利工况及其流量确定  被引量:23

Determination of the worst operating condition and discharge of overtopped cofferdam during construction stage

在线阅读下载全文

作  者:胡建明[1] 胡志根[1] 杨学红[1] 肖焕雄[1] 

机构地区:[1]武汉大学水利水电学院,湖北武汉430072

出  处:《水动力学研究与进展(A辑)》2003年第3期266-270,共5页Chinese Journal of Hydrodynamics

基  金:国家自然科学基金资助项目 ( 5 0 0 790 17)

摘  要:本文系统分析了影响土石过水围堰溢流工况的主要因素 ,提出衡量最不利工况的指标和确定最不利流量的方法 ,为土石过水围堰堰体下游护坡结构及消能防冲设施设计提供了理论依据。通过理论计算结果与模型试验现场观测资料数据对比分析 。Factors affecting the operating condition of earth rock overtopped cofferdam was systematically analyzed. A method was worked out for measuring the worst operating condition and determining the worst discharge of overtopped cofferdam during construction stage. The results provide theoretical basis and method selecting overflow discharge for the downstream slope protection structure, energy dissipation and reosion control facilities. Comparison with the results of theoretical calculation and model examination shows the method presented herein is reasonable.

关 键 词:土石过水围堰 最不利工况 施工导流 可靠性分析 抗冲流速 过水期 流量 

分 类 号:TV551.36[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象