检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡建明[1] 胡志根[1] 杨学红[1] 肖焕雄[1]
出 处:《水动力学研究与进展(A辑)》2003年第3期266-270,共5页Chinese Journal of Hydrodynamics
基 金:国家自然科学基金资助项目 ( 5 0 0 790 17)
摘 要:本文系统分析了影响土石过水围堰溢流工况的主要因素 ,提出衡量最不利工况的指标和确定最不利流量的方法 ,为土石过水围堰堰体下游护坡结构及消能防冲设施设计提供了理论依据。通过理论计算结果与模型试验现场观测资料数据对比分析 。Factors affecting the operating condition of earth rock overtopped cofferdam was systematically analyzed. A method was worked out for measuring the worst operating condition and determining the worst discharge of overtopped cofferdam during construction stage. The results provide theoretical basis and method selecting overflow discharge for the downstream slope protection structure, energy dissipation and reosion control facilities. Comparison with the results of theoretical calculation and model examination shows the method presented herein is reasonable.
关 键 词:土石过水围堰 最不利工况 施工导流 可靠性分析 抗冲流速 过水期 流量
分 类 号:TV551.36[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.254.100