机构地区:[1]水利部东北勘测设计研究院,吉林长春130021 [2]延吉市水利局,吉林延吉133000
出 处:《东北水利水电》2003年第6期13-14,共2页Water Resources & Hydropower of Northeast China
摘 要:尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。一期导流明渠布置在左岸滩地上,由于明渠开挖底高程及明渠段坝体现浇混凝土防渗墙底高程等低于河床常水位,因此采用链槽铺塑作防渗围护施工。本文结合工程实际,对链槽铺塑设计及施工作简要综述。The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core. The construction diversion is used two stages. The open channel diversion is disposed on the bottomland of the left bank for first stage. Owing to the bottom level excavated the open channel and constructed the concrete cutoff wall is lower than the normal water level of the river channel, so the chain slot spreading membrane is used to construct the impervious works. The paper summarizes the design and the construction of the chain slot spreading membrane combining the project practice.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229