检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《土木工程学报》2003年第6期53-59,共7页China Civil Engineering Journal
基 金:国家自然科学基金(编号50178013)
摘 要:介绍了在湖南岳阳洞庭湖大桥进行风雨振观测的情况,得到了拉索加速度时程曲线、拉索振动的加速度轨迹和共振频率;通过数值仿真和现场试验全面评估了磁流变阻尼器对拉索振动控制的性能,得出了阻尼器安装位置、外部激励大小及阻尼器输入电压大小等参数对拉索系统各阶模态阻尼比的影响规律及磁流变阻尼器的减振效果。结果显示在安装磁流变阻尼器后拉索系统的前三阶模态阻尼比大大增加,并且存在一个优化电压,在该电压下能取得最大的模态阻尼比,表明磁流变阻尼器具有良好的减振性能。实际风雨振观测进一步验证了其良好的减振效果。A Wind-rain induced vibration and its control on the stay cables of cable-stayed bridges are studied in the paper. The time-history of acceleration response for the Dongting Lake Bridge is obtained. It is also obtained with the acceleration record and frequencies of the stay cables. A magneto-rheological damper is used for the stay cables. The results are shown that the first three modal damping ratios of the stay cables increasing greatly after attaching the dampers. It is also compared with that of the numerical simulations and field tests. It is found that the maximum modal damping ratio is arrived when an optimal voltage achieved.
分 类 号:U441.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3