检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:管曙荣[1] 史云[1] 聂红梅[1] 黄小原[1]
出 处:《东北大学学报(自然科学版)》2003年第7期707-709,共3页Journal of Northeastern University(Natural Science)
基 金:辽宁省自然科学基金资助项目(9910200208).
摘 要:研究了实物期权方法在可推迟的多项目预算决策中的应用·通过二叉树方法描述了项目价值随时间变化的路径,进而构造出多项目资本预算决策的模型,并探讨了根据实际需要如何对模型的各种限制条件进行调整·与净现值法相比,实物期权方法考虑了项目的投资机会价值,能求得在资本预算限制下公司可以投资的具有内在期权价值的项目组合,因而可以对公司战略决策中高不确定性项目的投资决策提供支持·The method of real option is compared with the method of net present value (NPV) to deal with decisionmaking on project with high uncertainty. The application of real option method on budgeting decision on multiple projects that can be deferred was studied. The project value as a function of time using binomial tree was considered to set up a model for budgeting decision on multiple projects. Modification of the model in need of the reality was also discussed. The model can be very important to support the decisionmaking of company's investment strategy.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.181.89