邵阳市体育馆钢网架整体爬升施工  被引量:1

Integral lift construction of steel network roof structure for the Shaoyang city gymnasium

在线阅读下载全文

作  者:肖功宝 陈振谋 杨宗耀 匡长安 

机构地区:[1]湖南省第四建筑工程公司

出  处:《建筑技术》1992年第4期239-241,共3页Architecture Technology

摘  要:邵阳市体育馆双向正交斜放平板钢网架施工中,为解决大型吊装机具不足的问题,将网架在地面拼装,使用GYD-35型液压千斤顶通过φ25钢吊杆使网架爬升就位。采用这种方法,工作条件好,施工进度快,不需加固,操作方便、安全。The roof structure of the Shaoyang city gymnasium consists of 2 steet network roof structures being normally intersected with each other and laid down in oblique planes. Owing to the insuffciency of big cranes, these 2 steel network roof structures are fabricated on ground level, and then they are integrally hoisted and installed in their respective positions through φ25 hanger rods by the GYD-35 hydraulic jack. It has been proved as a good integral lift construction method, and appraised as an efficient, easy, safe, quick and no need of any strengthening process.

关 键 词:施工 体育馆 拼装 钢网架 整体爬升 

分 类 号:TU758.13[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象