检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学
出 处:《电站系统工程》2003年第4期10-12,共3页Power System Engineering
摘 要:在热力系统优化调度计算中,采用常规方法所建立的热电联供汽轮机模型通常精度较差。本文提出了依据实时运行数据采用线性规划的汽轮机特性建模方法,在建模允许的误差范围内它反映了大多数正常运行数据所表达的共同变化规律,同时对异常数据进行剔除。采用该方法的建模结果表明该方法可以获得热电联供汽轮机准确的特性方程。In the calculation of optimal dispatch for a thermal system, the model built by the conventional method for power-heat cogeneration steam turbines is of poor accuracy. In this paper, a linear-programming modeling method is adopted based on the field operation data, which reflects the common regulation of variation expressed by the normal data in the majority within the allowed modeling error and discards the abnormal data at the same time. The modeling result based on the field operation data shows that an accurate equation of performance for a power-heat cogeneration steam turbine can be achieved.
关 键 词:汽轮机 建模 热电联供 热力系统 优化调度 线性规划
分 类 号:TK267[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145