出 处:《基建优化》2003年第3期7-8,共2页Optimization of Capital Construction
摘 要:介绍了工程施工中承包商向业主索赔的程序。该程序包括 :提出索赔要求 ,报送索赔资料 ,谈判协商 ,邀请中间人调解 ,提交仲裁机构或法院。实践中 ,并不是在每次索赔中这些程序都会全部出现。比如 ,邀请中间人调解成功之后 ,就没有必要再提交仲裁机构或法院了。采取文中所提出的程序 。This paper introduced claim procedures that the constructor does to the owner in the construction. The procedures include: Bringing up the claim, the sending of the claim data, negotiation, intermediation from the agent, handing over to the arbitrament organization or court. Actually, not all the claim procedures will appear. For example, there is no need of turning to the arbitrament organization or court after a successful intermediation. Thus the contractor's legal rights can be protected under the procedures mentioned in this paper.
分 类 号:TU723.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170