垃圾填埋场设计中的若干问题研究——以襄樊洪山头填埋场为例  被引量:5

Research on several problems in the design of solid waste landfill——Hongshantou solid waste landfill in Xiangfan as example

在线阅读下载全文

作  者:张季如[1] 

机构地区:[1]武汉理工大学土木工程与建筑学院,湖北武汉430070

出  处:《水文地质工程地质》2003年第4期42-45,共4页Hydrogeology & Engineering Geology

摘  要:襄樊市洪山头垃圾填埋场投资和建设周期均受控于压实粘土坝和渗滤液与沼气收集系统两个关键因素,技术难度大。基于有限元分析结果确定土坝边坡的最佳坡度,采用土工格栅加筋土和包裹式坡面结构新技术加固坝体边坡。介绍一种收集管设置在砾石盲沟内的渗滤液与沼气收集系统,该系统的渗滤液收集和防淤塞能力强,可有效防止收集管弯曲和断裂。The compacted clay dam and percolate and methane collection system are two key factors that control the investment and construction period of the solid waste landfills of Hongshantou in Xiangfan city. Based on the results of Finite Eelement Method (FEM) for the stability of dam slope, the optimum angle of slope is determined. The techniques of the reinforcement dam slide slope with geogrid and packaged slope surface structure are presented. The percolate and methane collection system, which the collection pipes are installed in the blind ditches that are consisted of gravels is introduced. This system can avoid silting, collect percolate easily, and protect the pipes from bending and damaging.

关 键 词:垃圾填埋场 设计 渗滤液 沼气收集系统 粘土坝 有限单元法 

分 类 号:X705[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象