超长隧洞施工测量若干问题研究  被引量:2

THE RESEARCH OF THE CONSTRUCTION SURVEY FACING SOME PROBLEMS IN EXTREMELY LONG TUNNEL

在线阅读下载全文

作  者:王腾军[1] 田青文[1] 

机构地区:[1]长安大学地质工程与测绘工程学院,陕西西安710054

出  处:《长安大学学报(地球科学版)》2003年第2期66-69,共4页

摘  要: 超长隧洞施工测量属于超规范作业,为保证超长隧洞贯通,必须对超长隧洞施工测量进行研究。对隧洞施工测量中洞口控制网布设、数据处理及其误差对贯通的影响与洞内基本控制网的布设、平差及检核方法等若干问题进行了研究,所得成果已运用于引黄入晋工程中的南干5#和7#超长隧洞施工测量中,确保了两超长隧洞的顺利贯通。The construction survey of extremely long tunnel is a work beyond the standards. The especial problem of the control survey of extremely long tunnel must be researched in order to ensure two parts of the tunnel linkingup. This paper discusses the control network establishment, the data calculation, the influence of the control survey on the precision of the lateral linking-up and the adjustment and the checking way of traverse survey inside the tunnel. The conclusions have been used in the NO.5 tunnel and NO.7 tunnel of south main trunk of YINHUANGRUJIN project and ensured the two tunnel linking up successfully. 

关 键 词:超长隧洞 施工测量 洞口控制测量 逐次平差 洞内基本控制网 贯通 洞口控制网 水工隧洞 

分 类 号:TV672.1[水利工程—水利水电工程] TV221

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象