XLPE电缆绝缘在线检测直流叠加法的接地  被引量:11

Study on the Grounding in Superposing DC Current Method for the On-line Monitoring of XLPE Cable

在线阅读下载全文

作  者:王一[1] 文习山[1] 彭宁云[1] 陈巧勇[1] 

机构地区:[1]武汉大学电气工程学院,武汉430072

出  处:《高电压技术》2003年第7期34-36,51,共4页High Voltage Engineering

摘  要:运用直流叠加法的XLPE电缆在线检测装置投入6~35kV系统后,将使系统中PT中性点以及电缆屏蔽层的接线发生改变。通过基于ATP-EMTP软件的仿真计算以及相关分析,针对故障状态下发生PT饱和谐振时,改接线对6~35kV中性点不接地系统可能产生的影响作出分析并找出相应的解决办法。If the XLPE cable on-line monitoring system, which is based on the method of superposing a low DC voltage on the neutral point of PT ,is used in 6-35 kV power system, the way of grounding of potential transformers and the shielding layer of cable must be changed. Depending on simulations with the ATP-EMTP and some correlative analysis, the paper analyzes the possible effects on power system caused by changes of the grounding way when there is a fault caused by the over saturated windings of a potential transformer, and gives corresponding methods to solve the problems.

关 键 词:XLPE电缆 电力电缆 在线检测 直流叠加法 接地 电力系统 仿真模型 

分 类 号:TM862[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象