集装箱码头装卸工艺设计中几个问题的思考  被引量:1

Consideration of Some Problems Concerning Container Terminal Handling Technology Design

在线阅读下载全文

作  者:肖向东[1] 

机构地区:[1]中交第四航务工程勘察设计院,广东广州510230

出  处:《水运工程》2003年第7期15-17,共3页Port & Waterway Engineering

摘  要:结合工程设计实例,对当前集装箱码头装卸工艺设计中需要重视的几个问题如:岸桥海测轨至码头前沿的距离、岸桥与RTG及拖挂车之间的数量配置比例、装卸辅助作业及船舶靠离泊时间之和对码头年通过能力的影响、大门检查桥在现代条件下设置的必要性等进行探讨。Combining an engineering design example, this paper discusses several problems needing attentions concerning current container terminal handling technology design including: distance between seaside rail of container crane and apron of dock, allocation proportion among container crane, RTG and container trailer, influence of the sum of auxiliary operation time and vessel berthing and unberthing time on the annual throughput capacity of terminal, as well as the necessity of setting up of check bridge at entrance of container terminal under modern conditions.

关 键 词:集装箱码头 装卸工艺 设计 思考 

分 类 号:U656.135[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象