弯曲测线野外施工条件分析  被引量:3

FIELD WORK CONDITIONS FOR CROOKED LINES

在线阅读下载全文

作  者:周中礼 施兰花 

机构地区:[1]中国石油吐哈油田分公司勘探开发研究院,新疆哈密839009

出  处:《吐哈油气》2003年第2期173-174,共2页Tuha Oil & Gas

摘  要:应用几何地震学研究方法,计算了弯曲测线坐标,实际偏移距产生的剩余时差。由于偏移距对地震剖面质量影响较大,因此,有必要对弯曲测线野外施工条件进行分析。弯曲测线拐角太长,引起剩余时差,剩余时差是造成资料处理中迭加效果不佳的主要原因。研究认为,弯曲测线在资料处理中面元应选择在300m之内,同时野外施工中弯曲测线拐角应小于45°。The coordinate of crooked lines and the residual moveout caused by actual offset distance were calculated by geometric seismology method. Due to the significant effects of offset distance on seismic profLle quality, it is necessary to analyze the field work condition for crooked lines. It is concluded that the residual moveout caused by the comer of a crooked line is the major factor that lead to poor stacking result in seismic data process. The author recommend bins in crooked line data process should be less than 300m, and comers in field work less than 45°.

关 键 词:几何地震学 弯曲测线 野外施工 弯线拐角 共中心点面元 偏移距 石油 物理勘探 

分 类 号:P631.4[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象