作 者:陈剑华[1]
出 处:《水力发电》2003年第8期37-38,共2页Water Power
摘 要:在山西西龙池抽水蓄能电站施工测量中,采取导线加密控制测量和带状地形图测绘的同步测量方案,利用全站仪开展导线控制测量与碎部测量同步进行,最后用微机进行测量后的数据处理工作。该方法可提高水利水电施工测量的工作效率和测量精度,并拓展了全站仪的使用范围;根据精度要求,这种方法适用于附合导线长度小于4km的测量区域。The synchronous measurement scheme of combining the wire encryption control survey and strip topography mapping was taken in the course of the engineering survey for the Xilongchi Pumped Storage Power Station, located in Shanxi Province. The fullstation device was adopted to conduct synchronously the traverse survey and the detailed survey. Computer was used to process all the measurement data. Such method can enhance the working efficiency and measurement accuracy of hydroengineering survey and the use of fullstation device can be stretched. But it only applies to the measurement area with the traverse length of less than 4 km.
关 键 词:导线测量 碎部测量 数据处理 全站仪 西龙池抽水蓄能电站
分 类 号:TV221.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3