11层钢筋混凝土框架楼房爆破拆除  被引量:11

DEMOLITION OF AN 11-STOREYED REINF ORCED CONCRETE FRAME BUILDING BY B LASTING METHOD

在线阅读下载全文

作  者:张翠兵[1] 张承珍 邓志勇[1] 张志毅[1] 

机构地区:[1]铁道科学研究院,北京100081 [2]深圳市建筑工程质量监督总站,深圳518031

出  处:《工程爆破》2003年第2期30-32,11,共4页Engineering Blasting

摘  要:采用定向爆破方法拆除11层钢筋混凝土框架楼房。由于立柱的布筋情况不明,通过爆破试验确定了炸药单耗,针对不同的立柱尺寸确定爆破参数。为了有利于结构解体,在5层以上的部分大断面柱体上和梁柱节点处也布置炮孔。文中还介绍了起爆网路、安全防护措施及爆破效果。An 11 storeyed reinforced concrete frame building was demoli shed by directional blasting metho d Due to unknown bar reinforcement ,a specific charge was determined through trial blasts and the blasting parameters were designed in the light of different posts So me blasthol es were arranged in partial large sectional posts and beam post join ts over fifteenth floor,thus being favorable to structural disintegra tion In addition,the firing circui t,safety precautions and blasting results were introduced in this pa per

关 键 词:钢筋混凝土框架 楼房 爆破拆除 定向爆破 

分 类 号:TU746.5[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象