三峡水利枢纽围堰发电期梯级调度运行方式  被引量:1

Cascade dispatching operation modes of the Three Gorges Project during cofferdam power generation period

在线阅读下载全文

作  者:何文社[1] 袁杰[1] 曹叔尤[2] 肖舸[1] 赵云发[1] 戴会超[1] 

机构地区:[1]三峡工程开发总公司梯级调度中心,湖北宜昌443002 [2]四川大学高速水力学国家重点实验室,四川成都610065

出  处:《水力发电》2003年第7期56-59,共4页Water Power

基  金:国家自然科学基金;水利部资助重大项目(5 9890 2 0 0 );中国长江三峡工程开发总公司博士后基金资助

摘  要:根据三峡水利枢纽工程进度及相关部门的要求 ,就三峡 (围堰发电期 )~葛洲坝水利枢纽联合调度运行中有关泄洪设施的运用调度方式 ,三期围堰安全度汛方案 。According to the construction progress of the Three Gorges Project and the demands of some departments concerned, this paper fully analyzes four modes of the combined dispatching operation of the Three Gorges Project~Gezhouba hydropower station during cofferdam power generation period, that is, the dispatching mode of flood-releasing structures, the third-stage cofferdam passing safely through flood season, the cascade dispatching mode of power generation, the cascade dispatching mode of navigation and ship lock.

关 键 词:三峡水利枢纽 围堰 梯级水库 联合调度 

分 类 号:TV551.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象