检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京矿冶研究总院,北京100044
出 处:《有色金属》2003年第3期112-113,129,共3页Nonferrous Metals
基 金:国家财政部资源补偿费重点资助项目 (国财字 [1998] 486)
摘 要:介绍寿王坟铜矿上部采空区内存窿矿石地下溶浸注浆防渗试验结果和现场施工效果。试验采场注浆孔总长798 4m ,注浆量 11 3 7L·m- 1 ,注浆压力 1 5~ 2 0MPa,注浆成本 1 0 6元·t- 1 矿 ,注浆后矿体吸水率 0 2 5 9L·min- 1 ·m- 1 ·m- 1H2 O ,渗透系数 0 0 3 0 1m·d- 1 。注浆防渗技术用于解决地下溶浸浸出液渗漏问题是可行的。The results and effects of experiment and practice in test stope on grout curtain and penetration resistance technology for solution seepage prevention of the residue ore in situ leaching in Shouwangfen Copper Mine are described. In the operation of test stope, the total length of penetration holes is 798.4m, the penetration volume is 11.37L·m -1 hole, and the penetration pressure is 1.5~2.0MPa and the cost is 1.06$·t -1 ore. The water adsorption rate and seepage coefficient of the penetrated ore body are 0.259L·min -1 ·m -1 ·m -1 H 2O and 0 0301m·d -1 respectively. The grout curtain and penetration resistance technology is feasible to prevent the solution seepage of the residue ore in situ leaching in Shouwangfen Copper Mine.
关 键 词:采矿工程 注浆防渗 水泥注浆 地下浸出 回收 浸出液
分 类 号:TD853.37[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173