机构地区:[1]广东省公路局,广州510075 [2]重庆交通科研设计院,重庆400067
出 处:《公路交通技术》2003年第4期76-80,95,共6页Technology of Highway and Transport
摘 要:渝黔高速公路真武山隧道为西南地区已建最大规模的 3车道扁平状大断面长大公路隧道 ,跨度大、地质情况十分复杂且无法回避。设计中进行了大量的方案比选工作 ,在设计和配合施工工作中 ,结合工程实际进行了大量的研讨 ,克服了重重困难 ,使隧道在提前一年工期条件下顺利通车。Zhenwushan Tunnel on Chongqing-Guizhou Expressway is the largest highway tunnel with large flat section and three lanes in southwest China. A lot of schemes have been compared during design because the tunnel has a large span andsituates at an unavoidable complicated geologic condition. During design and construction, a lot of researches have been carried out according to the engineering practice. And a lot of difficulties have been overcome so that the tunnel was open to traffic one year ahead of schedule.
关 键 词:公路隧道 高速公路 总体设计 方案比选 选址 平断面布置 纵断面布置 技术标准
分 类 号:U452.2[建筑科学—桥梁与隧道工程] U459.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117