检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院,湖北武汉430010
出 处:《南水北调与水利科技》2003年第3期29-32,共4页South-to-North Water Transfers and Water Science & Technology
摘 要:该文阐述三峡明渠导流的模型试验研究成果,含明渠池流能力,过流断面形式,渠道进口纵向堰头部形状,河岸保护,航道河段整治及船只上行航线等。并对原型泄洪运行中尤其是1998年大洪水作了观测,包括明渠水流情况,两岸水位,明渠底面冲淤变化,围堰护坡淘刷及船只航行等。This article introduces the model test achievement of Three Gorges Project open channel diversion, including open channel discharge capacity, discharge section configuration, longitudinal cofferdam head configuration of channel intake, river bank protection , sea route river section renovation and up - sail sea route etc. In the article prototype discharge operation achievement (flood operation in 1998 specially) is also introduced, including open channel water - flow condition, water level of both river banks, open channel bottom section eroding and silt changes, slope - protector erosion of cofferdam and ship navigation, etc.
关 键 词:明渠导流 纵向围堰 河岸保护 航道整治 航迹线 运行观测
分 类 号:TV845[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3