火电厂烟气脱硫工程建设方案的经济评价  被引量:8

Economical Appraisal on FGD Engineering Construction Scheme of Thermal Power Plants

在线阅读下载全文

作  者:李忠华 薛建明 韩琪 

机构地区:[1]国电环境保护研究所,南京市210031

出  处:《电力建设》2003年第8期60-63,共4页Electric Power Construction

摘  要:影响烟气脱硫 (FGD)经济性的因素有FGD工艺的类型 ,建设FGD的电厂和机组的状况 ,现有机组FGD的改造因子。FGD经济评价的指标有 :工程总投资、单位容量造价、年运行费用、脱硫成本、售电电价的增加、改造因子。计算改造因子时 ,影响因素有 :范围调整、工艺因子、地点因子、改造难度。The factors influencing on the economy of FGD include the type of FGD process, conditions of power plant construction and unit with FGD, the FGD reforming factors of the existing units. The indexes for FGD economic appraisal include the total engineering investment, unit capacity cost, annual operation cost, desulphurization cost, increment of electricity sale price and reform factor. For calculating the reform factors the influence factors cover the range of regulation, process factor, location factor, difficulty of reform. A detailed description is given for the economic appraisal method.

关 键 词:火电厂 烟气脱硫工程 FGD工艺 二氧化硫 大气污染 经济评价 

分 类 号:X773[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象