公伯峡水电站施工渡汛方案  被引量:2

The Scheme of Flood Handling During Construction Period of Gongboxia Hydro-Power Station

在线阅读下载全文

作  者:王义民[1] 田峰巍[1] 黄强[1] 谢小平[1] 

机构地区:[1]西安理工大学水利水电学院,陕西西安710048

出  处:《西安理工大学学报》2003年第2期135-138,共4页Journal of Xi'an University of Technology

基  金:国家重点基础研究发展规划资助项目(G1999043608);陕西省重点实验室资助项目(02JS37)。

摘  要:通过分析公伯峡水电站施工渡汛的影响因素,确定龙羊峡水库的运行方式是影响施工渡汛的主要因素。针对龙羊峡水库的实际运行情况,着重研究了龙羊峡水库不同运行方式对公伯峡水电站施工渡汛的影响,给出了合理的渡汛方案。The factors which affect flood handling during construction period of Gongboxia hydropower station have been analysed and the operation mode of Longyangxia reservoir has been considered as the main factor.Based on the real operation condition of Longyangxia reservoir, the influence of different operation modes of Longyangxia reservoir on flood handling during construction period of Gongboxia hydropower station is has been intensively studied, and the rational scheme has been proposed.

关 键 词:水电站 施工渡汛 洪水调度 

分 类 号:TV697.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象