检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部天津水利水电勘测设计研究院
出 处:《水利水电工程设计》2003年第3期13-15,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:岳城水库运行已 4 0多年 ,因先天不足 ,虽经过多次除险加固 ,仍存在着防洪标准不足和主坝下游坝坡散浸等质量隐患。介绍了提高防洪标准的第二溢洪道设计和工程质量隐患的除险加固设计 ,尤其第二溢洪道为国内罕见的大流量软基溢洪道 。Having been operated for 40 years,the Yuecheng reservoir still has some hidden quality problem such as insufficient flood control capacity,higher moisture content at the downstream slope of the main dam etc. Due to its inherent shot comings,even after several times of risk removal and remedy treatment. In this paper,the design of the second spillway in increasing the flood control standard and the risk removal and remedy design in eliminating the hidden project quality problem are described,especially for the second spillway which is the unique great flow soft foundation spillway in China. In addition,it also print out in this paper the engineering measures accepted for the key design point of the soft foundation spillway.
分 类 号:TV697.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117