岳城水库除险加固工程设计  被引量:1

Yuecheng reservoir risk-removal and remedy project design

在线阅读下载全文

作  者:时长波[1] 李培基[1] 

机构地区:[1]水利部天津水利水电勘测设计研究院

出  处:《水利水电工程设计》2003年第3期13-15,共3页Design of Water Resources & Hydroelectric Engineering

摘  要:岳城水库运行已 4 0多年 ,因先天不足 ,虽经过多次除险加固 ,仍存在着防洪标准不足和主坝下游坝坡散浸等质量隐患。介绍了提高防洪标准的第二溢洪道设计和工程质量隐患的除险加固设计 ,尤其第二溢洪道为国内罕见的大流量软基溢洪道 。Having been operated for 40 years,the Yuecheng reservoir still has some hidden quality problem such as insufficient flood control capacity,higher moisture content at the downstream slope of the main dam etc. Due to its inherent shot comings,even after several times of risk removal and remedy treatment. In this paper,the design of the second spillway in increasing the flood control standard and the risk removal and remedy design in eliminating the hidden project quality problem are described,especially for the second spillway which is the unique great flow soft foundation spillway in China. In addition,it also print out in this paper the engineering measures accepted for the key design point of the soft foundation spillway.

关 键 词:岳城水库 除险加固 溢洪道 工程设计 工程质量 

分 类 号:TV697.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象