三峡大坝泄洪工程介绍  

The Introduction of the Spillway Gates Control Project of Three Gorges Dam

在线阅读下载全文

作  者:陈忠华[1] 

机构地区:[1]北京机械工业自动化研究所,北京100029

出  处:《自动化博览》2003年第4期24-28,34,共6页Automation Panorama1

摘  要:主要介绍长江三峡大坝的泄洪闸门控制工程,工程包括47个泄洪闸门,位于大坝中部,分为3组。泄洪闸门分别由14个S7-400 PLC本地站(Profibus-DP主站)和45个ET-200M远程站(Profibus-DP从站)进行控制。它们被配置成二级网络,高层是冗余光纤控制网络(100兆以太网),底层为现场总线DP网络。该项目是世界上最大的水利工程项目。This article describes the spillway gates control project of Yangtze River Three Gorges dam. There are forty-seven spillway gates in the middle of the dam of Three Gorges. They can be divided in three groups. There are fourteen local stations of S7-400 PLC (Profibus-DP masters) and forty-five ET-200M remote stations (Profibus-DP slave). They are arranged in two levels network. The high level net is Redundant Fiber OpticControl Network (100M Ethernet network)and lower level is Profibus-DP network. This is the biggest hydraulic engineering project in the world.

关 键 词:三峡大坝 泄洪工程 现场总线 泄洪闸门 泄洪坝段 

分 类 号:TV651[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象