作 者:简文彬[1] 姚环[1] 焦述强[1] 彭功勋[1] 廖光平
机构地区:[1]福州大学岩土工程与工程地质研究所,福州350002 [2]核工业华南工程勘察院,龙岩364000
出 处:《岩石力学与工程学报》2002年第1期43-47,共5页Chinese Journal of Rock Mechanics and Engineering
摘 要:福建漳州—龙岩高速公路龙岩段石崆山II号高架桥经过工程地质条件复杂的岩质高边坡地段。该边坡岩体发育有3组优势结构面J 1,J 2,J 3,分别以单结构面与边坡面组合、两组优势结构面共同与边坡面组合,以及3组优势结构面共同与边坡面组合进行赤平投影分析,综合判定自然边坡基本稳定。对自然边坡及拟开挖的人工边坡进行SARMA极限平衡分析,定量判别该高边坡整体处于稳定状态。The viaduct No.II of Shikongshan in Zhangzhou—Longyan expressway is located at a high slope with a complicated engineering geological condition. There are three sets of dominant structural plane J1,J2developed in the high slope rock mass. The combined slope plane with single dominant structural plane of rock mass,two sets of dominant structural plane and three sets of dominant structural plane,is analyzed by Stereographic projection respectively. The result shows that the natural slope is basically stable. Furthermorestability of slope to be excavated and natural slope is evaluated by SARMA limit equilibrium method,the high slope is also considered steady.
分 类 号:U418.52[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43