检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《水科学进展》2003年第5期622-625,共4页Advances in Water Science
基 金:国家自然科学基金资助项目(50079017)~~
摘 要:系统分析河道来流和泄水建筑物结构尺寸的不确定性与过水围堰运行时下游护坡流速水头和设计抗冲流速水头不确定性之间的关系,以及影响围堰下游护坡安全运行的因素。在土石过水围堰最不利流量的分析方法基础上,提出了用围堰下游护坡的流速水头超过设计条件下最不利溢流工况所对应的抗冲流速水头的概率来刻划溢流工况设计风险率。运用可靠性理论的JC法,给出了过水围堰溢流时设计风险率的计算方法,为堰体下游护坡结构及消能防冲设计提供了理论依据。The paper systematically discusses the relations of uncretainty between the current velocity head, design head of erosion protection of the downstream slope blocks, construction flood and sizes of diversion structure during operation of rockfill cofferdam, and analyzes the operational safety affecting cofferdam slopes Based on the computational method for the worst flood discharge during overtopped rockfill cofferdam, a design overflow risk is measured by the probability that current velocity head of cofferdam downstream slope blacks exceeds its design erosion protection headA computational method for design risk in overflow period of cofferdam is given by using the JC method of reliability theory, providing a theoretical rule of structural design ,energy dissipation and erosion protection for overtopped rockfill cofferdam
关 键 词:过水土石围堰 下游护坡 溢流设计 风险率模型 泄水建筑物 土石围堰 过水围堰 消能防冲
分 类 号:TV551.3[水利工程—水利水电工程] TV653
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.237.153