检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴宝琴[1] 聂源宏[1] 梁宗祥[1] 纪志强[1]
机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水利水电技术》2003年第9期15-18,共4页Water Resources and Hydropower Engineering
基 金:西北农林科技大学青年科研专项基金项目
摘 要:通过模型试验对乌江洪家渡水电站泄洪洞进口水流特性、有压段出口体型、跌坎掺气特点及下游出口消能问题进行了研究和优化,满足工程泄洪和消能要求.进口喇叭口顶缘选取悬链线型式,以改善流态和提高泄量;工作弧门后设突扩突跌体型和掺气坎来满足掺气减蚀要求;出口选取曲面贴角窄缝鼻坎的消能工型式,其适应于峡谷河道消能防冲,水舌纵向拉开形态好,适合各种流量运行,具有降低边墙高度、结构受力好、便于水舌跨岸等优点,从而减轻下游冲刷程度,达到消能防冲的目的.A model experiment of spillway tunnel of the Hongjiadu Hydropower Plant was conducted and investigation on intake water flow,aeration step and energy dissipation was made. The type of the pressure segment outlet was optimized in order to meet the requiremens of flood releasing and energy dissipation. The intake bell mouth took the curve of catenaries to improve flow pattern and to increase discharging capacity. A sudden enlargement and aeration steps were set up at the backward radial gate to promote aeration and to mitigate cavitation. The outlet was designed with narrow bucket lips sticking to the cape so as to lead the water nappe flashing into the river in the narrow canyon. This type of structure would have advantages of low side wall, good state of stress, suitable operation under various conditions of flood discharging, sufficient extension of jet and effective alleviation of downstream scour, etc.
分 类 号:TV13[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145