检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团海外工程公司,湖北武汉430050 [2]中铁大桥局集团有限公司,湖北武汉430050
出 处:《世界桥梁》2003年第4期10-13,共4页World Bridges
摘 要:介绍帕克西桥钻孔桩基础桩底压浆的施工,包括材料、设备及施工工艺。通过荷载试桩和O Cell试验,揭示了桩底压浆后桩端阻力和桩侧摩阻力成倍提高的现象,并对施工经验进行了总结。This paper presents the construction process of pile base grouting for bored pile foundations of Paksey Bridge, in which the selected materials, equipment and construction technology are covered. On the basis of the pile load tests and Osterberg-Cell tests, the paper reveals the phenomenon that the resistances at the pile tips and the frictional resistances at the pile sides are increased in times after the pile bases are grouted, and also summarizes the construction experiences acquired therefrom.
关 键 词:钻孔灌注桩 桩底压浆 承载力 施工工艺 帕克西桥 桩基础
分 类 号:U445.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145