小湾左岸堆积体高边坡锚固硐加固处理方案研究  被引量:3

The Study on the High Slope Anchorage Pier Reinforcing Treatment Scheme of the Accumulation Body on the Left Bank of the Xiaowan Hydropower Project

在线阅读下载全文

作  者:束小龙[1] 梅明荣[1] 任青文[1] 傅树红[2] 

机构地区:[1]河海大学土木学院,江苏南京210024 [2]国电公司昆明勘测设计研究院,云南昆明650051

出  处:《云南水力发电》2003年第4期9-12,共4页Yunnan Water Power

基  金:国家电力公司重点科技项目 (攻关 )计划 (合同号 :0 1 -0 2 -0 6 (2 ))

摘  要:根据小湾工程坝前堆积体高边坡加固处理,提出采用大直径混凝土锚固硐的加固方案,作者用三维弹塑性非线性有限元,对加固后的堆积体稳定性进行研究分析,并对锚固硐自身的应力状态、锚固硐直径、锚固硐长短等不同因素对堆积体稳定性的影响进行了比较分析。This paper has put forward an alternative of reinforcing the accumulation body high slope located upstream of the Xiaowan dam by constructing large diameter concrete anchorage piers, and made a study and an analysis of the stability of the then reinforced accumulation body using the three-dimensional elastic-plastic non-linear finite element method. The paper has also made a comparison and an analysis of the influences caused by such various factors as stress state of the anchorage pier itself, diameter and length of the anchorage pier on the stability of the accumulation body.

关 键 词:小湾工程 岩质高边坡 稳定性 加固 非线性有限元 混凝土 锚固硐 

分 类 号:TV554.13[水利工程—水利水电工程]

 