检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省交通规划设计院,江苏南京210001 [2]江苏省苏通大桥建设指挥部,江苏南通226009
出 处:《江苏地质》2003年第4期237-241,共5页Jiangsu Geology
摘 要:利用规范判别膨胀土类型常常出现不一致的困惑 ,结合宁淮高速公路等工程实例就“不一致”问题提出作者的见解 ,并对此工程的膨胀土改性处理进行了掺灰比试验研究。The total length of Ning (Nanjing)-Huai (Huaian) is about 200 km. The authors participated the preliminary prospecting of engineering geology for the segment from Yongzhuang in Pukou, Nanjing to Wudun in Huain with a length of 143 km. During the field work and indoor analysis,the classification discrimination for the expanded clay were at loose ends, based on the Standard of Roadbed Design (JTJ013-95),the discrimination led to two contradictory conclusions. Brought with the doubts about how to evaluate, describe and discriminate the expanded clay and how to treat the expanded clay effectively as they are important issues should be solved in engineering geological prospecting,the authors advance their own viewpoints in combination with the practical project examples in Ning-Huai Express Way,the unidentical problems on the standard in discriminating the expanded clay are solved. And a plaster mix ratio test study is also conducted to modify the expanded clay in the project mentioned above.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117