检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东省地震局 [2]山东省计算中心
出 处:《西北地震学报》1992年第2期59-63,共5页Northwestern Seismological Journal
基 金:地震科学联合基金
摘 要:本文给出了一种处理井水位对气压影响滞后的方法,同时给出了计算公式。以鲁03井为例,用这种方法求出其井水位气压系数为6.41mm/hpa,水位对气压响应的滞后时间为1.52小时。该方法排除气压影响的效果较好,水位的气压校正中误差明显减小。In this paper, a new processing method of phase lag of response of water level to barometric pressure is given. The formulae for calculating the barometric coefficient and lag time of the well level in consideration of lag influence are given. Taking well Lu—03 as an example, by using the new method, it is obtained that the barometric coefficient is 6.41 mm/hPa and the lag time of the response of well level to barometric pressure is 1.52h. The standard deviation of the water level corrected by barometric pressure decreases obviously.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42