检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国农业大学信息与电气工程学院,北京市海淀区100083
出 处:《智能电网》2015年第4期318-321,共4页Smart Grid
摘 要:在负荷动态增长的基础上,通过建立逐年随负荷增长而新投建设备的动态设备增长模型,并计及原有电网设备负载率的影响,计算电网建设费用、运行损耗费用、维护费用、检修费用、设备残值额,从而构建出合理的农网改造经济计算模型,为解决实际中面对两个(或多个)都达到改造年限要求的供电区域优先改造哪一个的优化决策问题,给出合理的解决方案和计算模型,为工程实践提供参考依据。ABSTRACT:Based on the dynamic growth of load, a dynamic growth model for the equipments which are newly constructed along with increases in load growth year after year is created. And taking the load rate of the original power network equipments into account, the cost of power grid construction, the cost of losses during operation, maintenance costs, recondition expense, and remanent value of equipment are calculated. Then a reasonable economic calculation model of rural power network transformation is built which will be able to provide reasonable solution and calculation model for making optimization decisions about which power supply area is given priority to be chosen when both two (or more) power supply areas have reached the deadline for being transformed, and it provides a reference frame for engineering practice.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3