三峡二期围堰防渗墙墙体材料水下成型特性研究  被引量:2

Study on characteristic of cutoff wall material moulding under ground water in phase?Ⅱ cofferdam of Three Gorges Project

在线阅读下载全文

作  者:孙厚才[1] 李青云[1] 朱冠美[2] 李思慎[1] 

机构地区:[1]长江科学院土工研究所,湖北武汉430010 [2]长江科学院材料与结构研究所,湖北武汉430010

出  处:《长江科学院院报》2004年第1期26-28,32,共4页Journal of Changjiang River Scientific Research Institute

摘  要:运用均匀设计方法对三峡二期围堰防渗墙墙体材料的水下特性进行了墙体材料的水下成型试验研究。试验结果表明:防渗墙墙体材料水上和水下成型试件的力学指标具有相当大的差异,水下成型环境下墙体材料的实际抗压强度比同期常规成型试件的抗压强度约低40%~20%,初始切线模量比同期常规成型试件的初始切线模量约低40%~10%,但随着龄期的增长,差异越来越小。这一研究成果为防渗墙墙体材料设计参数的变更及防渗墙的验收提供了科学依据。In order to study the properties of material of phase?Ⅱ cofferdam cutoff wall in Three Gorges Project, a test of the material moulding under ground water is conducted to compare with that of ordinary moluding. The test result shows a notable difference of the mechanical index of the material between two cases. That is the compression strength of the material with underwater moulding is 40%-20% lower than that of ordinary moulding, and the initial elastic mouldus of the former is 40%-10% smaller than the latter, but the difference decreases gradually with ages. The research result provides a scientific basis to mend design parameters of the cutoff wall, as well as to check and accept the cutoff wall.

关 键 词:防渗墙 墙体材料 水下成型 三峡工程 土石围堰 

分 类 号:TV41[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象