作 者:祝瑞金[1] 李莉华[1] 郑淮[1] 韩天祥[1]
出 处:《华东电力》2004年第1期18-22,共5页East China Electric Power
摘 要:介绍了美加“8·14大停电”事故调查组中期报告中关于北美历次大停电事故的对比分析部分 ,详细介绍了历次大停电事故中存在的一些共性的问题和相应的建议 ,指出了华东电网存在的相关问题 ,并提出相应建议。The comparative analysis of North American blackouts in history in Interim Report made by ‘8·14’blackout task force was introduced. The following common problems of these blackouts were expatiated in detail: flashover of transmission line to branches, incorrect estimation of generator's dynamic reactive output, the difficulty in acquiring information of the whole network by the operator, people can not ensure whether the system is operating in safety, lack of coordination of system protection equipments, low efficiency of communications, lack of safety nets, inadequate training for operators. The relevant suggestions to the above problems were introduced. The similar problems existing in the East China Grid were pointed out and relevant recommendations were put forward as well.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28