水电站引水发电系统过渡过程整体物理模型试验探讨  被引量:17

Study on the physical simulation of transient process in conduits of hydropower stations

在线阅读下载全文

作  者:杨建东[1] 李进平[1] 王丹[1] 陈鉴治[1] 吴荣樵[1] 

机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072

出  处:《水力发电学报》2004年第1期57-63,共7页Journal of Hydroelectric Engineering

摘  要:水电站引水发电系统过渡过程是流体、机械、电气、甚至结构相互耦合的复杂的动态过程 ,现有的将水、机、电分开研究的方法及成果无法满足大型长输水道地下式水电站设计和运行的需要 ,所以需要开展水电站过渡过程整体性物理模拟。本文作为初步的探讨 ,着重介绍模型比尺、水机电整体模拟、控制测试以及大波动、小波动和水力干扰等过渡过程的试验结果 。The transient process in the conduits of hydropower stations is a very complicated dynamic procedure coupled with fluid,machines,electricity,and even structure.The current methods used to analyze them separately cannot satisfy the design and the operation requirements of those large underground stations with long conduits.So it is necessary to develop a global physical simulation for the power station transients.As an initial discuss,this paper focuses on the introduction of model scale of similarity,integral simulation with fluid,machines and electricity,transients control and measurement,and some experimental results about great fluctuation,small fluctuation and hydraulic interference in transient process.The comparison of experimental and computational results is presented in this paper.

关 键 词:水电站 过渡过程 相似律 模型比尺 整体模型试验 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象