检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国管理科学》2003年第6期25-28,共4页Chinese Journal of Management Science
基 金:教育部高校博士学科点专项基金资助项目(20010487015)
摘 要:根据所安装设备发生故障时对生产过程的影响,备件的需求可划分为关键需求和非关键需求。基于此,研究了需求服从泊松分布、提前期等于常数、基于(S-1,S)订货策略的随机库存模型,提出当库存降低到预定水平,则预留存货以满足关键需求的控制策略,并给出了不同优先级备件服务水平的计算方法。最后结合某核电站库存管理中的一个实例,验证了本文所设计模型的优点和准确性。According to the influence caused by the disabled equipment that a spare part was installed,demand for spare parts could sometimes be classifieded into critical and non-critical demands.This paper dealt with a stochastic inventory model with Poisson demand,a deterministic lead time and a lot-for-lot stocking policy.We put forth a new policy where some of the stock was reserved for critical demand and had derived an algorithm to approximate the service levels for both classes of demand.The case study of a power plant showed the advantages of using the new policy.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.33.186