检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第四航务工程勘察设计院,广东广州510230
出 处:《水运工程》2004年第3期85-88,共4页Port & Waterway Engineering
摘 要:深圳妈湾电厂码头工程包括2个5万吨级专用卸煤泊位,其码头使用荷载大:距码头前沿线33m起堆煤高度15m。码头结构采用对荷载适应性强的沉箱重力式。为减少码头前沿的反射波高,巧妙地在卸荷板和胸墙中设置进、出水孔和消浪室。并且对基槽开挖深度进行优化设计,取得了显著的经济效益。The terminal for Shenzhen Mawan Power Plant includes two50,000dwt specialized coal-unloading berths and its heaped load is rather heavy:the coal stacking height is up to15m from33m behind the quay line and concrete caisson is adopted for adapting the heavy loads.Water inlet&outlet and wave breaking chambers are arranged for relieving slab and breast wall to reduce the reflected wave height alongside the berth.Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.
分 类 号:U656.139[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28