作 者:李勇[1]
机构地区:[1]国家电力公司成都勘测设计研究院,四川成都610072
出 处:《水电站设计》2004年第1期5-14,共10页Design of Hydroelectric Power Station
摘 要:在溪洛渡水电站可行性研究阶段,根据目前挤包绝缘电缆和SF6气体绝缘管道母线技术水平、运行业绩和电站500kV高压引出线特点,对发 变组高压侧三种接线方式(单元接线、二机联合单元接线和三机联合单元接线)的500kV引出线进行了选择。This paper describes that during Xiluodu Hydroelectric Power Station fisibility study stage,according to present state of art & operation performance of squeeze wrappage insulated cables & SF6 gas insulated tubular buses as well as characteristics of the power station 500kV lead out wires,500kV lead out wires were selected for 3 types of generator-transform unit connection(signle generator-transformer unit connection,2 generator-transformer unit combination connection & 3 generator-transformer unit combination connection).
关 键 词:溪洛渡水电站 绝缘电缆 SF6气体绝缘管道 电气主接线 500kV高压引出线
分 类 号:TV734.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31