摘  要:介绍了二滩大坝在低于设计死水位运行时,对拱坝横缝开合度的监测分析,重点对18号灌区测缝计布置、测缝计基准值的选取、封拱后缝面的接触状态,以及横缝开合度的预测进行了介绍,并提出了应重视的问题。This paper describes monitoring analysis of Ertan Arch Dam transverse joints during its operation below the designed dead storage level.Stress is laid on arrangement of jont meters in the grout compartment No.18,selection of the joint meter datum values & contact condition between the joint surfaces after all the joints being grouted.The paper also gives a presentation of the transverse joint opening prediction & points out the relevant problems,which attention should be paid to.

关 键 词:二滩拱坝 横缝开合度 测缝计 蓄水 混凝土浇筑 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象