黄河拉西瓦水电站分期装机的探讨  被引量:1

Discussion on Installation of Generating Equipment in Stagesfor Laxiwa Hydroelectric Power Station on Yellow River

在线阅读下载全文

作  者:周家骢[1] 

机构地区:[1]中国国际工程咨询公司,北京100044

出  处:《水电站设计》2004年第1期34-38,共5页Design of Hydroelectric Power Station

摘  要:拉西瓦水电站是龙羊峡至青铜峡河段自上而下的第二个梯级,装机总规模6×700MW,从坝址径流、满足青海省用电需求、与下游梯级尼那水电站运行衔接及送电经济性等方面综合分析,在"南水北调"西线调水一期工程实施前,拉西瓦水电站装机容量可按2800MW考虑;西线调水一期实施后,根据市场需求,再确定后2台机组的安装进度。Laxiwa Hydroelectric Power Station is the second hydropower project from upstream to downward on the Yellow River reach from Longyang Gorge to Qingtong Gorge with its total installed capacity of 6×700MW.In this paper installation of Laxiwa Hydroelectric Power Station generating equipment in stages has been studied.Through comprehensive analysis of the runoff at the hydroelectric power station dam sit,satisfying the power demand of Qinghai Province,hydraulic link with Nina Hydroelectric Power Station immediately downstream & economics of power transmisson,it is considered to install 2800MW at Laxiwa Hydroelectric Power Station before execution of the 'Water Transfer from South to North of Chain' Project the west route for the water diversion first stage works.After the first stage works of the west route are executed the rest 2 generating unit of Laxiwa Hydroelectric Power Station installation schedule will be determined according to the power market demand.

关 键 词:黄河 拉西瓦水电站 装机容量 径流 坝址 

分 类 号:TV547[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象